3-Tier Metal Wire Fruit Basket Stand – Matte Black | S-Curve Design

3-Tier Metal Wire Fruit Basket Stand – Matte Black | S-Curve Design

Rs.50.00
Skip to product information
3-Tier Metal Wire Fruit Basket Stand – Matte Black | S-Curve Design

3-Tier Metal Wire Fruit Basket Stand – Matte Black | S-Curve Design

Rs.50.00

Your Kitchen Counter’s Most Beautiful Centrepiece.

Display your fruits in style with this elegant 3-Tier Metal Wire Fruit Basket Stand. The sweeping S-curve cascading frame holds three wire bowls at different heights — creating a stunning tiered display that keeps your fruits organised, visible, and ripening evenly. Durable steel construction, gripped feet to protect your surfaces, and a stacked bowl arrangement that saves precious counter space. Perfect for everyday use and entertaining.

Key Features

  • 3-Tier Cascading Design: Three wire bowls arranged in a sweeping S-curve — each tier at a different height for easy access and beautiful display
  • Open Wire Design: Open wire basket construction encourages air circulation — fruits and vegetables ripen evenly and stay fresh longer
  • Durable Steel Construction: Heavy-gauge steel frame and baskets — sturdy enough to hold a full load of fruit without bending
  • Stacked Bowl Arrangement: Vertical stacking saves countertop space — fits in a small footprint while holding a large amount of fruit
  • Gripped Feet: Rubber-tipped feet protect delicate countertop surfaces from scratches
  • Matte Black Finish: Sleek matte black powder-coat — looks stunning in modern, rustic, and classic kitchens alike
  • Perfect for Entertaining: A beautiful centrepiece for dinner parties, Eid gatherings, and everyday kitchen display

Dimensions

  • Overall: 19” H x 12.75” W x 13” D
  • Top Bowl: 2.34” H x 8.55” W x 8.55” D
  • Middle Bowl: 2.5” H x 9.55” W x 9.55” D
  • Bottom Bowl: 2.95” H x 11.25” W x 11.25” D

Perfect For

  • Fruits — mangoes, apples, oranges, bananas, cherries & more
  • Vegetables — tomatoes, onions, garlic & potatoes
  • Kitchen counter centrepiece & display
  • Dining table fruit display
  • Eid & entertaining — impress your guests
  • Gifting — a beautiful and practical housewarming gift

Care Instructions

Wipe clean with a damp cloth. Dry immediately to maintain the powder-coat finish. Do not submerge in water.

Three tiers of beauty. One stunning centrepiece. Your kitchen deserves this. 🍊✨

You may also like